Freiburg(Breisgau) Central: Tickets, Map, Live Departure, How-to, Routes


Freiburg(Breisgau) Central Building

Db_freiburg_breisgau__hbf_station_outside

Inside Freiburg(Breisgau) Central

Db_freiburg_breisgau__hbf_station_inside

Freiburg(Breisgau) Central How to

An unusual feature of the Bresgau Hbf is that the tram stops at the station and is located on a bridge across the railway track.

The bridge is connected to the platform/gorge of the station via stairs, escalators and lifts (behind the escalator), at the southern end of the station - so in front of the train arriving from the north (from Karlsruhe, Mannheim, etc.) And the rear of the train arriving from Basel.

If you don't need a tram or want to take a taxi, you can leave the station through its main building.

It connects to gleis (platform/track) 2 - 8 via the channel below the track.

Escalators and stairs connect the canyon (platform/track) to the passageway, with escalators and lifts entering the main station building.

A 10-minute walk from the Hbf in Breisgau to the city centre, from the main exit to EisenbahnstraBe.

Take the train to the forests of Freiburg:

From Freiburg Hbf into the Schauinslandbahn (the longest cable car in Germany):

(1) From Breisgau, Hbf takes tram number 3 (in the direction of Vauban) or tram number 5 (in the direction of Rieselfeld) to the Johanneskirche station.

(2) Connect to tram number 21 (Gunterstal direction) and take the tram to the terminal station in Gunterstal. (3) At the Guntersertal tram stop, you can transfer to the 21 bus (Horben direction). Bus line 21 stops at the funicular base station - 'Schauinslandbahn Talstation)

This sounds much more complicated than it actually is, and all connections are always running.

Admire the stunning views of the Black Forest Gateaux from the top of the 90-minute peak of the Hbf train station in Breisgau (one of the highest peaks in the Black Forest). Freiburg's Three Lakes Railway

The train heading east from Freiburg to Neustadt (Schwarz) runs on the scenic Höllentalbahn route and stops at Titisee, where you can reach Titisee. The beautiful Dreiseenbahn (Three Lakes Railway) between Sebrugg and Seebrugg.

When travelling from Freiburg to Seebrugg, you must wait approximately 30 minutes at Titisee to take the connecting train.

The name of this line comes from the three lakes through Titisee, Windgfällweiher and Schluchsee.

When you board the train on Titisee and sit on the right (facing the direction of travel), you can see the views of these lakes. During the journey, the three lakes will be on the left, but the train will turn 180 degrees while driving.

The Feldberg-Bärental station is one stop away from Titisee and offers a bus connection to the Feldberg base car park, the highest peak in Germany outside the Alps.

Steam trains operated by the heritage railway group Interessengemeinschaft 3-Seenbahn e.V. on certain days of the year. Follow the Three Lakes line between Titisee and Seebrugg and the full length of the Höllentalbahn between Freiburg and Donaueschingen.


Freiburg(Breisgau) Central Station Plan

platform map

Address

Freiburg (Breisgau) Hauptbahnhof, Bismarckallee, Altstadt-Ring, Altstadt, Freiburg im Breisgau, Regierungsbezirk Freiburg, Baden-Württemberg, 79098, Deutschland


Main stations in





Train and bus from Freiburg(Breisgau) Central



Train and bus to Freiburg(Breisgau) Central

station interior photo
station interior photo

Scan QR code, download G2Rail App to see Freiburg(Breisgau) Central's more live update, station guide, plan and photos
apple-store google-store

Main Railway Operators


Ultimate Guide to German Railway

German Railway

Ultimate Guide to German Railways

For those who love to travel, the quality and service of German Railways (Deutsche Bahn AG or German Railway abbreviated as DB) are world-class, with free entry and exit without ticket gates, ICE high-speed trains with a speed of nearly 300 kilometers per hour, and dense With the railway network and precise and punctual schedules, if you want to enjoy the way of traveling through the state and provinces on the train, Germany can be said to be the best choice.

There are approximately 37,000 trains operating in Germany every day. Most of the trains are operated by 24 railway companies under Deutsche Bahn. Deutsche Bahn also has the world's third densest railwa...


Ultimate Guide to Flixbus

Flixbus

Ultimate Guide To FlixBus/FlixTrain

Friends who live in Europe know that buses are currently one of the cheapest ways to travel in Europe. Flixbus is currently the largest long-distance bus company in Europe.

At present, Flixbus not only does business in popular tourist cities, but most of the large residential towns in Europe have bus stations, including Germany, France, Italy, Netherlands, Poland, Czech Republic, Denmark, Sweden, Norway, Switzerland, Spain , Portugal, Hungary, Austria, Croatia, Belarus and other countries. Among them, the German route is the cheapest. Flixbus began to expand to the United States in 2018, and currently has thousands of sites in the United States. ...


Ultimate Guide to French Railway

French Railway

Ultimate Guide to French Railway

The French railway system is planned and constructed by the French National Railway Agency (Socicte Nationalc des Chemins de Fer Francais, abbreviated as SNCF). The route is centered on Paris and woven in all directions, including high-speed trains (Train a Grande Vitesse, abbreviated as TGV). Routes, and general train routes that go to cities and towns. Among these general train routes, the nationwide inter-regional route is called the "Grande Ligne" (GL for short), and the routes that only travel within a single area are collectively called "Regional Rapid Transport System" (Transports Express Regionaux, referred to as TER).

(https://sematicweb.detie.cn/railways/...


Ultimate Guide to Belgian National Railway

Belgian National Railway

The Ultimate Guide to The Benelux (Netherlands, Belgium, Luxembourg) railway

In the European railway system, the Netherlands, Belgium, and Luxembourg will be taken as a whole, so the Eurail train pass will provide a Eurail BeNe Rail Pass. The Benelux Railway is mainly composed of three railway companies.

Dutch Railway System

The Dutch railway is operated by Nederlandse Spoorwegen (NS), and some regional roads are operated by other companies, but no additional ticket purchase is required. The main car types are Intercity (IC), Stoptrein and Sneltrein. Intercity only stops in major cities, which is equivalent to Taiwan's Ziqiang; Stoptrein stops at every station, which is equivalent to a shuttle bus; and Sneltrein is between the two, which is almost the level of Fuxing.

![N...


Ultimate Guide to Austrian National Railway

Austrian National Railway

Ultimate Guide to Austrian Railways

Traveling through Austria by train is now getting faster and easier. The best way to explore Austria is to travel through magnificent mountain views, lush alpine meadows, historic towns and picturesque villages. Austria is located in the central part of the European continent adjacent to Germany and Italy. It also borders the Czech Republic, Slovakia, Hungary, Slovenia, Liechtenstein and Switzerland. Its train network is well connected to surrounding countries. With a punctuality rate of 96%, ÖBB was one of the most reliable railway operators in Europe in 2018.

Austria’s main train service operator is the state-owned company ÖBB, which serves almost the entire country. There are some private railway companies that are not part of ÖBB. In the corr...